Notifications

All roles · 70 unread · SLA escalations + step hand-offs.

InboxEmail Outbox
CriticalSLA Executive escalation (L3) — “Commercial Launch” is 13d overdueNPD Committee

Planned end 2026-06-27 passed 13 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Escalation (L2) — “Commercial Launch” is 13d overdueMarketing / Commercial

Planned end 2026-06-27 passed 13 day(s) ago; step is still “Not Started”. Escalated to Marketing / Commercial at tier 2 (Escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Reminder (L1) — “Commercial Launch” is 13d overdueOperations

Planned end 2026-06-27 passed 13 day(s) ago; step is still “Not Started”. Escalated to Operations at tier 1 (Reminder).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

CriticalSLA Executive escalation (L3) — “Launch Gate” is 14d overdueNPD Committee

Planned end 2026-06-26 passed 14 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Escalation (L2) — “Launch Gate” is 14d overdueNPD Committee

Planned end 2026-06-26 passed 14 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Reminder (L1) — “Launch Gate” is 14d overdueMarketing / Commercial

Planned end 2026-06-26 passed 14 day(s) ago; step is still “Not Started”. Escalated to Marketing / Commercial at tier 1 (Reminder).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

CriticalSLA Executive escalation (L3) — “Pilot” is 17d overdueNPD Committee

Planned end 2026-06-23 passed 17 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Escalation (L2) — “Pilot” is 17d overdueNPD Committee

Planned end 2026-06-23 passed 17 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Reminder (L1) — “Pilot” is 17d overdueOperations

Planned end 2026-06-23 passed 17 day(s) ago; step is still “Not Started”. Escalated to Operations at tier 1 (Reminder).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

CriticalSLA Executive escalation (L3) — “Training Brief Readiness” is 24d overdueNPD Committee

Planned end 2026-06-16 passed 24 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Escalation (L2) — “Training Brief Readiness” is 24d overdueNPD Committee

Planned end 2026-06-16 passed 24 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Reminder (L1) — “Training Brief Readiness” is 24d overdueOperations

Planned end 2026-06-16 passed 24 day(s) ago; step is still “Not Started”. Escalated to Operations at tier 1 (Reminder).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

CriticalSLA Executive escalation (L3) — “Supply / QA / ERP” is 29d overdueNPD Committee

Planned end 2026-06-11 passed 29 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Escalation (L2) — “Supply / QA / ERP” is 29d overdueQA / Regulatory

Planned end 2026-06-11 passed 29 day(s) ago; step is still “Not Started”. Escalated to QA / Regulatory at tier 2 (Escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Reminder (L1) — “Supply / QA / ERP” is 29d overdueProcurement

Planned end 2026-06-11 passed 29 day(s) ago; step is still “Not Started”. Escalated to Procurement at tier 1 (Reminder).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

CriticalSLA Executive escalation (L3) — “Product & Costing” is 43d overdueNPD Committee

Planned end 2026-05-28 passed 43 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Escalation (L2) — “Product & Costing” is 43d overdueFinance

Planned end 2026-05-28 passed 43 day(s) ago; step is still “Not Started”. Escalated to Finance at tier 2 (Escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Reminder (L1) — “Product & Costing” is 43d overdueR&D

Planned end 2026-05-28 passed 43 day(s) ago; step is still “Not Started”. Escalated to R&D at tier 1 (Reminder).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

CriticalSLA Executive escalation (L3) — “Feasibility Gate” is 53d overdueNPD Committee

Planned end 2026-05-18 passed 53 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Escalation (L2) — “Feasibility Gate” is 53d overdueNPD Committee

Planned end 2026-05-18 passed 53 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Reminder (L1) — “Feasibility Gate” is 53d overdueR&D

Planned end 2026-05-18 passed 53 day(s) ago; step is still “Not Started”. Escalated to R&D at tier 1 (Reminder).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

CriticalSLA Executive escalation (L3) — “Idea & Brief” is 56d overdueNPD Committee

Planned end 2026-05-15 passed 56 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Escalation (L2) — “Idea & Brief” is 56d overdueNPD Committee

Planned end 2026-05-15 passed 56 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Reminder (L1) — “Idea & Brief” is 56d overdueMarketing / Commercial

Planned end 2026-05-15 passed 56 day(s) ago; step is still “Not Started”. Escalated to Marketing / Commercial at tier 1 (Reminder).

10 Jul 2026 · NPD-003 · Bottled Herbal Tea · Open

WarningSLA Escalation (L2) — “Commercial Launch” is 3d overdueMarketing / Commercial

Planned end 2026-07-07 passed 3 day(s) ago; step is still “Not Started”. Escalated to Marketing / Commercial at tier 2 (Escalation).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Reminder (L1) — “Commercial Launch” is 3d overdueOperations

Planned end 2026-07-07 passed 3 day(s) ago; step is still “Not Started”. Escalated to Operations at tier 1 (Reminder).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Escalation (L2) — “Launch Gate” is 4d overdueNPD Committee

Planned end 2026-07-06 passed 4 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Reminder (L1) — “Launch Gate” is 4d overdueMarketing / Commercial

Planned end 2026-07-06 passed 4 day(s) ago; step is still “Not Started”. Escalated to Marketing / Commercial at tier 1 (Reminder).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

CriticalSLA Executive escalation (L3) — “Pilot” is 7d overdueNPD Committee

Planned end 2026-07-03 passed 7 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Escalation (L2) — “Pilot” is 7d overdueNPD Committee

Planned end 2026-07-03 passed 7 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Reminder (L1) — “Pilot” is 7d overdueOperations

Planned end 2026-07-03 passed 7 day(s) ago; step is still “Not Started”. Escalated to Operations at tier 1 (Reminder).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

CriticalSLA Executive escalation (L3) — “Training Brief Readiness” is 14d overdueNPD Committee

Planned end 2026-06-26 passed 14 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Escalation (L2) — “Training Brief Readiness” is 14d overdueNPD Committee

Planned end 2026-06-26 passed 14 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Reminder (L1) — “Training Brief Readiness” is 14d overdueOperations

Planned end 2026-06-26 passed 14 day(s) ago; step is still “Not Started”. Escalated to Operations at tier 1 (Reminder).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

CriticalSLA Executive escalation (L3) — “Supply / QA / ERP” is 19d overdueNPD Committee

Planned end 2026-06-21 passed 19 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Escalation (L2) — “Supply / QA / ERP” is 19d overdueQA / Regulatory

Planned end 2026-06-21 passed 19 day(s) ago; step is still “Not Started”. Escalated to QA / Regulatory at tier 2 (Escalation).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Reminder (L1) — “Supply / QA / ERP” is 19d overdueProcurement

Planned end 2026-06-21 passed 19 day(s) ago; step is still “Not Started”. Escalated to Procurement at tier 1 (Reminder).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

CriticalSLA Executive escalation (L3) — “Product & Costing” is 33d overdueNPD Committee

Planned end 2026-06-07 passed 33 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Escalation (L2) — “Product & Costing” is 33d overdueFinance

Planned end 2026-06-07 passed 33 day(s) ago; step is still “Not Started”. Escalated to Finance at tier 2 (Escalation).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Reminder (L1) — “Product & Costing” is 33d overdueR&D

Planned end 2026-06-07 passed 33 day(s) ago; step is still “Not Started”. Escalated to R&D at tier 1 (Reminder).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

CriticalSLA Executive escalation (L3) — “Feasibility Gate” is 43d overdueNPD Committee

Planned end 2026-05-28 passed 43 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Escalation (L2) — “Feasibility Gate” is 43d overdueNPD Committee

Planned end 2026-05-28 passed 43 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Reminder (L1) — “Feasibility Gate” is 43d overdueR&D

Planned end 2026-05-28 passed 43 day(s) ago; step is still “Not Started”. Escalated to R&D at tier 1 (Reminder).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

CriticalSLA Executive escalation (L3) — “Idea & Brief” is 46d overdueNPD Committee

Planned end 2026-05-25 passed 46 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Escalation (L2) — “Idea & Brief” is 46d overdueNPD Committee

Planned end 2026-05-25 passed 46 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

WarningSLA Reminder (L1) — “Idea & Brief” is 46d overdueMarketing / Commercial

Planned end 2026-05-25 passed 46 day(s) ago; step is still “Not Started”. Escalated to Marketing / Commercial at tier 1 (Reminder).

10 Jul 2026 · NPD-002 · Summer Lemon Tea · Open

CriticalSLA Executive escalation (L3) — “Commercial Launch” is 8d overdueNPD Committee

Planned end 2026-07-02 passed 8 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Escalation (L2) — “Commercial Launch” is 8d overdueMarketing / Commercial

Planned end 2026-07-02 passed 8 day(s) ago; step is still “Not Started”. Escalated to Marketing / Commercial at tier 2 (Escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Reminder (L1) — “Commercial Launch” is 8d overdueOperations

Planned end 2026-07-02 passed 8 day(s) ago; step is still “Not Started”. Escalated to Operations at tier 1 (Reminder).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

CriticalSLA Executive escalation (L3) — “Launch Gate” is 9d overdueNPD Committee

Planned end 2026-07-01 passed 9 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Escalation (L2) — “Launch Gate” is 9d overdueNPD Committee

Planned end 2026-07-01 passed 9 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Reminder (L1) — “Launch Gate” is 9d overdueMarketing / Commercial

Planned end 2026-07-01 passed 9 day(s) ago; step is still “Not Started”. Escalated to Marketing / Commercial at tier 1 (Reminder).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

CriticalSLA Executive escalation (L3) — “Pilot” is 12d overdueNPD Committee

Planned end 2026-06-28 passed 12 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Escalation (L2) — “Pilot” is 12d overdueNPD Committee

Planned end 2026-06-28 passed 12 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Reminder (L1) — “Pilot” is 12d overdueOperations

Planned end 2026-06-28 passed 12 day(s) ago; step is still “Not Started”. Escalated to Operations at tier 1 (Reminder).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

CriticalSLA Executive escalation (L3) — “Training Brief Readiness” is 19d overdueNPD Committee

Planned end 2026-06-21 passed 19 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Escalation (L2) — “Training Brief Readiness” is 19d overdueNPD Committee

Planned end 2026-06-21 passed 19 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Reminder (L1) — “Training Brief Readiness” is 19d overdueOperations

Planned end 2026-06-21 passed 19 day(s) ago; step is still “Not Started”. Escalated to Operations at tier 1 (Reminder).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

CriticalSLA Executive escalation (L3) — “Supply / QA / ERP” is 24d overdueNPD Committee

Planned end 2026-06-16 passed 24 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Escalation (L2) — “Supply / QA / ERP” is 24d overdueQA / Regulatory

Planned end 2026-06-16 passed 24 day(s) ago; step is still “Not Started”. Escalated to QA / Regulatory at tier 2 (Escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Reminder (L1) — “Supply / QA / ERP” is 24d overdueProcurement

Planned end 2026-06-16 passed 24 day(s) ago; step is still “Not Started”. Escalated to Procurement at tier 1 (Reminder).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

CriticalSLA Executive escalation (L3) — “Product & Costing” is 38d overdueNPD Committee

Planned end 2026-06-02 passed 38 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Escalation (L2) — “Product & Costing” is 38d overdueFinance

Planned end 2026-06-02 passed 38 day(s) ago; step is still “Not Started”. Escalated to Finance at tier 2 (Escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Reminder (L1) — “Product & Costing” is 38d overdueR&D

Planned end 2026-06-02 passed 38 day(s) ago; step is still “Not Started”. Escalated to R&D at tier 1 (Reminder).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

CriticalSLA Executive escalation (L3) — “Feasibility Gate” is 48d overdueNPD Committee

Planned end 2026-05-23 passed 48 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Escalation (L2) — “Feasibility Gate” is 48d overdueNPD Committee

Planned end 2026-05-23 passed 48 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Reminder (L1) — “Feasibility Gate” is 48d overdueR&D

Planned end 2026-05-23 passed 48 day(s) ago; step is still “Not Started”. Escalated to R&D at tier 1 (Reminder).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

CriticalSLA Executive escalation (L3) — “Idea & Brief” is 51d overdueNPD Committee

Planned end 2026-05-20 passed 51 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 3 (Executive escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Escalation (L2) — “Idea & Brief” is 51d overdueNPD Committee

Planned end 2026-05-20 passed 51 day(s) ago; step is still “Not Started”. Escalated to NPD Committee at tier 2 (Escalation).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open

WarningSLA Reminder (L1) — “Idea & Brief” is 51d overdueMarketing / Commercial

Planned end 2026-05-20 passed 51 day(s) ago; step is still “Not Started”. Escalated to Marketing / Commercial at tier 1 (Reminder).

10 Jul 2026 · NPD-001 · Grape Jasmine Tea · Open